
S23E4: Railway Bridge Ties, Membrane Filters, Hydraulic Post Drivers, Bi-Planes
S23E410.04/24/201421 min
Heavy timbers are cut, drilled and treated for use as railway ties on bridges. Selective membranes are formed and installed in filtration units; hydraulic mechanisms are assembled into machines that drive posts into the ground; and wooden or metal airframes, wings, control surfaces and engines are brought together to build biplanes.
Episode Ending
No ending yet
Comments
Please sign in to leave a comment
Cast & Crew
Cast

Lynne Adams
Narrator (voice)
Crew
Yanick Legrand
Director
Yan Savard
Director
François Senécal-Tremblay
Director

Linda Boyle
Writer
Details
- Air Date
- 4/24/2014
- Runtime
- 21 min
- TMDB Rating
- 10.0/10