S10E19: The Lexington Bed and Breakfast - 19
S10E190.01/5/1989
At the front of the house, our host watches Charlie McGongagle put up a permanent drain pipe, while John Silva installs a new storm door. In the master bedroom, our master carpenter is busy trimming the windows, while Mary-Van is painting window sashes. In the basement, our host watches as Tom Silva levels the basement floor where the washer and dryer will be located using a plaster based compound. Tile is set in the upstairs bath.
Episode Ending
No ending yet
Comments
Please sign in to leave a comment
Details
- Air Date
- 1/5/1989
- TMDB Rating
- 0.0/10