S35E14: Arlington 2014: Part 6: Additional Details
S35E140.02/8/2014
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.
Episode Ending
No ending yet
Comments
Please sign in to leave a comment
Details
- Air Date
- 2/8/2014
- TMDB Rating
- 0.0/10