
S36E14: Lexington Project 2015: Part 6: Exterior Details
S36E140.02/7/2015
A look at the mudroom door; the work required to patch in new clapboard; the back deck's hybrid railing system; and the layout and design choices for the kitchen. Also: what goes into a rough electrical inspection; and what's trending in kitchens.
Episode Ending
No ending yet
Comments
Please sign in to leave a comment
Details
- Air Date
- 2/7/2015
- TMDB Rating
- 0.0/10