
S36E15: Lexington Project 2015: Part 7: Inspections
S36E150.02/14/2015
Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.
Episode Ending
No ending yet
Comments
Please sign in to leave a comment
Details
- Air Date
- 2/14/2015
- TMDB Rating
- 0.0/10