S42E23: Dorchester Triple Decker | Finish Work Begins
S42E230.05/13/2021
On the first floor, Tom Silva and Kevin O'Connor reinstall the upper cabinets that survived the fire. Tom teaches the apprentices to trim a window in the kitchen. HVAC contractor James Bouchard shows Richard Trethewey the plan for hot water and heating. Kevin joins Carol and her sister Willie to shop for appliances for all three levels. Mark Ferrante is tiling the first of three bathrooms.
Episode Ending
No ending yet
Comments
Please sign in to leave a comment
Details
- Air Date
- 5/13/2021
- TMDB Rating
- 0.0/10