S44E19: Ipswich: Below Grade Plumbing

S44E190.04/20/2023

The old fireplace firebox is demolished leaving the chimney for the new fireplace. The dismantled timber frame pieces are restored offsite. Plumbing is run for a below grade bathroom. A steel beam is prepared for installation. Kevin goes clamming.

Episode Ending

No ending yet

Comments

Please sign in to leave a comment

This Old House S44E19: Ipswich: Below Grade Plumbing | Spoil the End